PILOT PLANT
Bancroft’s Monmouth deposit is modeled as a potential low cost mining operation due to proximity to infrastructure combined with historic metallurgical tests showing 87% recovery by simple gravity separation, demonstrates a potential for a reliable low cost producing Uranium deposit. The pilot plant for the bulk sample and metallurgical work will be conducted at Lakefield Research, a world class facility owned by SGS Laboratories, a 30 min drive from project.
Bancroft’s Monmouth deposit is modeled as a potential low cost mining operation due to proximity to infrastructure combined with historic metallurgical tests showing 87% recovery by simple gravity separation, demonstrates a potential for a reliable low cost producing Uranium deposit. The pilot plant for the bulk sample and metallurgical work will be conducted at Lakefield Research, a world class facility owned by SGS Laboratories, a 30 min drive from project.



